Home / Projects / Kfar Maimon

Agrivoltaic facility
on the farmland
of Kfar Maimon

Agrivoltaic

Southern District · Sdot Negev

Agrivoltaic facility at Kfar Maimon

Aerial visualisation · Kfar Maimon

Capacity

16 MW

Area

~225 dunams

Facility type

Agrivoltaic, high-voltage grid connected

Context

Next to an existing solar PV facility

Our role

Statutory planning, permits, detailed design

The project

A 16 MW agrivoltaic facility that adds energy production to Kfar Maimon's fields, without taking the land out of farming.

The facility covers roughly 225 dunams and connects to the high-voltage grid. The design integrates the new agrivoltaic development with an existing solar PV facility on the neighbouring plot, while maintaining agricultural continuity and carefully addressing the adjacent forest areas and nature reserves.

Planning, engineering and agricultural requirements were developed together by one team, so that the statutory plan, the permit and the detailed design all describe the same buildable project.

A

Agricultural continuity

Row spacing and panel height planned around ongoing cultivation and farm machinery.

B

An existing PV neighbour

Shared access roads, grid connection and a coherent edge with the existing facility.

C

Forest & nature reserves

Setbacks and planted buffers along the forest and the protected areas.

Planning sheets

The site, in section and plan.

Agrivoltaic section drawing

01 · Cross-section

Site plan drawing

02 · Site plan

Location

Western Negev, between the fields and the forest.

Kfar Maimon is a moshav in the Sdot Negev Regional Council, in an area of open fields, orchards and planted forest. That mix is exactly what makes agrivoltaic planning here demanding, and worthwhile.

District

South

Latitude

31.45° N

Longitude

34.56° E

  • Statutory planning
  • Building permit
  • Detailed design
  • GIS & survey
  • Environmental interface
Yoshivia site plan

Next project

Agrivoltaic facility, Yoshivia →